"Can I install photovoltaics without connecting to PPC (Public Power Corporation)?" - This is the most frequent question we receive. The answer is simple: Yes, it is perfectly legal - and in many cases, it is also the best option.

Legal Framework in Greece

System Type Permit PPC Connection
Off-grid (autonomous) ❌ Not required ❌ None
Hybrid ✅ Required ✅ With PPC/ADMIE
Net Metering ✅ Required ✅ With DEDDIE
Net Billing (businesses) ✅ Required by RAE ✅ With DEDDIE

When is off-grid profitable?

  • Holiday homes in Crete, Rhodes, Corfu, Mykonos, or mountainous areas
  • Agricultural plots and irrigation pumps without grid access
  • Caravans, boats, isolated installations
  • When connection fixed charges are higher than the system cost

Cost of an off-grid system

Size Cost Payback Period
2kW + 5kWh battery €4,000 – €6,000 4–6 years
5kW + 10kWh battery €9,000 – €14,000 4–5 years
10kW + 20kWh battery €18,000 – €25,000 5–6 years

Equipment we recommend

💡 Tip: If you have a holiday home on an island or in a mountainous area without a stable power connection, off-grid is almost always the best option in terms of cost and simplicity.

FAQ

Do I need a permit for an off-grid system?

No! For systems without a grid connection, no permit from PPC or ADMIE is required.

Can I add a battery later?

Yes! You can start with a smaller battery and expand later without changing the equipment.

What happens during cloudy months?

Batteries store energy even in cloudy conditions and winter. Nothing is lost.

👉 Request a free study now