Solar PV Thessaloniki 2026 | Hellenic Energy
For solar PV in Thessaloniki and Central Macedonia, we assess roof or flat-roof area, orientation, shading, electrical supply, annual consumption and major loads before recommending PV power or battery capacity.
Net Billing
For new grid-connected installations, design focuses on self-consumption and the economic use of generated energy.
Battery storage
LiFePO4 storage is considered when the load profile, backup requirement or energy-independence objective justifies it.
Off-grid
Holiday homes and remote applications require design based on winter production as well as peak loads.
What we do not promise
We do not quote one generic subsidy percentage, a fixed payback period or a “zero bill” without project data. Available programmes and terms are checked against official calls when the proposal is prepared.
Hellenic Energy solutions
We design systems using Victron, Deye, Solis, GoodWe, Pytes V5 lithium batteries and appropriate electrical protection, with expansion planned where technically supported.
Request a Free Initial Study
